top of page
INFRAESTRUCTURAS-DEL-TRANSPORTE-16-Tuneles-Alaskan-Way.png
INFRAESTRUCTURAS-DEL-TRANSPORTE-16-Tuneles-Alaskan-Way.png
1/1
USA 2012.
Alaskan Way Tunnel Sr99. Seattle (USA)
Client:
HNTB Corporation.
Service:
Tender Project in Offer and Collaboration in the drafting of the Detail Project..
Description:
Procurement in the tendering phase.
Collaboration with the main engineering in the drafting of the detail project.
Length: 1755.9 mi in TBM and 0.39 yd in fake tunnel.
Øint ≈ 17.3 yd, Excavated in geotechnically difficult terrain.
Øexcav = 19.17 yd (world record).
Initial well and tunnel boring machine exit.
Urban tunnel excavated under the city's most important buildings.
bottom of page